Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Guest Books Directory

Guest Books Directory Here is a great way to get some inbound links to your site, and message heard by people who also post and read these books. (Tip: Dont use your real email address on them)

Reply
 
Thread Tools Search this Thread Display Modes
Old 03-26-2011, 07:01 PM   #1
Tomy852929
Brigadier General
 
Join Date: Mar 2011
Posts: 909
Tomy852929 is on a distinguished road
Default coach purse cleaner 200 decoration tips ( very use

110, wardrobe rather more not less, rather big not small, the women remember! Dangling from the longest space to be able to dress down.

116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture doors open all the emission of odor, but also to buy something special spray to eliminate odors.

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.
119, on the fill paint: painting teacher pay is so dry wall putty finish and then approved, the putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical appliances. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, smeared the walls, the decoration is to make sure the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a trip (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the fear of affecting the duration of the case, but also the impact of the air to minimize dust, then point to a lot of diligent to clean the room, the health of the.

129, toilet, kitchen need background music, audio and audio wires embedded before the renovation.

124, covert project was not to save money the most important place: the circuit transformation of water, water treatment.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water 40 yuan per meter, the circuit 20 yuan per meter, with six months warranty. Details of B & Q on the first floor in the east of the individual services and pricing announced, we do reference

106, according to their actual needs and reasonable arrangements for wiring, so as not to waste (especially the cloth with a lot of lights and lighting if not practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can bake shoe device, I now regret not quite this wire cloth.

141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had prepared a bucket of wall paint, refresh yourself on a regular basis ... ...


142, sealed in the wall of water reform must allow the decoration to provide detailed master water map.


143, if the paint color for the walls, in the power transformation for time is necessary to take into account the problem of the line. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest level I made a mistake, I assumed that the bed 1.5 m width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.


145, started before the captain to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, ready to paint the wall works outsourced to the company's students. My family is contracted out to paint companies, such as woodworking look after painting the walls gray only know that it is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line must be re-wiring. But the terminal from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.


147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.


148, change the location of telephone and network cable, when the original fabric of the line can be drawn to continue to use. However, if the improper construction there will be many hidden dangers. So the best room of the weak from the box to be replaced.


149, measurement circuit transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (at trough length measurement, if a tank with multiple root canals, calculated according to half the number of tubes. The other half included in the overhead lines.)
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even if the number of replaced (replaced the line to tell the construction team do not throw).
(4) weak reform, according to the first method. The difference is who should pay attention to the weak line is purchased. Owners will have less to buy wire prices.


150, how the toilet fixed to the floor, hit the screw with it? There is convergence at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with the deployment of white cement + water slurry. When the toilet is generally purchased with a special sealant.



151, buy materials, we must first calculate your approximate usage. To buy water when the material to do anyway, after thinking about a painting materials by sea chart in the end how many came out, so little trust in a moment the foreman, the result was that buy the water 5 meters, the actual use 27 copper head months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under repeated questioning of the foreman back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 meters to 13 meters, other such as insulating tape, plug had great access was I correct ... ...


152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .


153, bathroom walls that retraction of the glove do not waste space, and posted a very good very nice tile. Of course, that tile union trouble saying


154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and loose some of good thing.


156, the bathroom floor if higher than the hall, the transition can be used to solve the door stone.


157, plus move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see the effect of significantly different .


159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.


160, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water repellent to use is not in accordance with the requirements of my bricklayer but directly poured on the ground, it can even do,波段操作股票才是有效的操作策略!~! It is not the best yourself, do not bother but assured.


162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and pretty, I think it is nonsense. Instead larger slope can quickly run a clean water is very soothing thing.


163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.


164, sink big market brand-name price is not cheap, brand-name quality crazy bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.


166, bathroom vanities and cabinets to do when they have to consider the size of basin lest good fit in the future.


167, the glass is heavy stuff, the best buy in the neighborhood, or first think of a good means of transport.


168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.


169, matte paint is high and light is beautiful, do not listen to the painter, and if not brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you


170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and now that he suggested this valuable. On the interior door is not bad, it really easy to use!


173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more


174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.


177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao lid kept it up elsewhere.


178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 element that can also be used, such as aluminum window frames with internal Jiu-level waste to plug the whole silica gel. However, all use the bathroom GE silicone kitchen, value for money!


179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if not installed, then only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the total leakage to pressure some time to test it, and install internal and less safe if the lead.


180, even in the diary has been renovated to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas,coach flip flops, to rely on them.




181,christian louboutin spring summer 2010 Baby together, fitting the biggest problem is communication!


182, little place, kitchen cabinet door type designed, BH. L-type should be designed.


183, general decoration, decoration companies, excluding the formal management fees, taxes, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, go in the kitchen on the ground outside the pipe, that is, from home improvement to a time bomb, who say where Shashi Hou himself in trouble.


185, if the separate tube wear, but in a tank of great? Effects can endure


186,The most creative performances per man- grid, ask what the restaurant and living room are separated between the most cost-effective package Door, side package only 6 cm, or contaminated with white, height 2 m, was not large High crude.


187, strong and weak power transfer to each tube, to separate the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can penetrate the same pipe.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.


189, the cabinet can be 15 cm plates and wood core board, the back of the five available folders, Wuli. Package doors and Tizi use nine per cent. Different materials with different techniques.


190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.


191, paint board is good, the advantages of both wood and composite.


192, do not print for a long time on the wet artificial stone, unless you want to dry a printing surface; they should not be long-term wet cutting board on the table. Wet wood is sometimes fade; rub the stain with a steel ball, like hand squeeze pimples.


193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.


194, clear contracting the tx Please note, we must verify the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.


195, the size of certain planned sanitary ware, the best sketch in advance, calculate the size.


196, students pay attention to the door to buy products, if you want to pursue results support the panel with the business package Door, then you may have to be Henzai knife it!


197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with international norms, as long as workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.


198, if an 8-core cable at the same time take the phone and network, will not interfere with each other it? Not. 1,2,3,coach purse cleaner,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the signal will cause some program-controlled switches on the network signal interference in the home environment generally will not have any problem. But rest assured that I can recommend such a route will leave separately to the margin, the network cable is very cheap that you say?


199, be sure to check the distribution box installed properly.


200, fitted bath and shower faucet lessons connected to the faucet pipe is embedded in the wall, and I repeatedly told them to size to get accurate, not to pretend not on time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the force feeding. Yesterday discovered that my fb leading high temperature coating device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.
109, the cabinet must be carefully chosen, compared to more than a few quality, we go to do a solid firm, because this one is easily thousands of ocean, and related to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if funds are limited, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.

117, installation of combustible gas, booking gas ignition.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang clothes stretch not open, even after the adjustment.

122, to use every penny wisely: look at the decoration materials, he must be looking tired, there are so many good things, it seems, like every single look, and economically able to withstand . A short period of time to make all these things can be purchased in place, the economic pressure is so big. Most people at this time is often in disarray, the results of the last one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the election materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business is always fine too buyers. I am doing a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the flower to flower.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problems is the transformation of the place, kitchen and toilet water.



1: the bathroom is divided into 2 areas of wet and dry on the wet area to drain better
2: If you are burning natural gas water heater attention to the bathroom to have adequate ventilation to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a lie.
11: hydropower is still looking for professionals to help themselves because the functions in this context also inform the design of their own lives who need to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can rest assured that when you do bad, but because the waterproof design problems in the choice of size If you encounter after the designers got the idea that he would not cut off the bricks to fill the ground so that you destroyed the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the pavement without being destroyed
19 when the combination is now bought ready-made cabinets are the most directly is because the family The water issues need to be close to create the design, of course designers in addition to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more comfortable to use sheet metal cabinet recommended to choose such a large load to bear safe



tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pool cell body, pins can be used in general, of course, if you will not care about the money.
large package if not, I suggest to buy building materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher label and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not appear again after the dust brush attachment on the surface of the wood products. All that being said, because a small renovation to hit the Wu family situation, I had decided to buy the hi seen it before Wood added the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been named Wu regret things. And I buy in the organization hi the process of adding paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.

105, be sure to change the water carefully, one charge of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.

103, as much as possible to communicate with construction workers, to determine whether he understands your intentions. Put ourselves in every respect the work of the master, respect him, and people feel the importance of family, and began to live to whether it is more responsible for some of it? Saying goes, is not called (But if you face a treacherous cunning bully, who, it would have to retaliate, argue) in particular to some marginal projects is the need for co-ordination of several trades, the workers will be responsible to each other and coordinate their respective duties, Otherwise, we pass the buck back and forth, all pass the buck. Like my mason to help me solve some carpentry thing,christian louboutin shoe size guide, and electrical and resolved some masonry problems. Because each teacher's experience is different, as long as he is willing to help you find a way.

127, home theater rear speakers,christian louboutin flats, the sound cables to be embedded in the living room below, this is very important!

107, the bathroom as wet and dry area, if area is small with a pedestal like (special glass basin was dirty, lazy with caution); conditionally set a waterproof cabinet incorporating small debris is best, what is put certainly does not look good on the outside.

112, curtains, furniture, household appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can track installed.

131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.


132, note 1 foundation construction, water, electricity transformation
(a) before entering the construction crews on the water to minute test, before they are allowed to change management.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, wrap need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the


134, tile
(a) the owners is required in the selection of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the length and width, measure out the size of the factory size to be consistent with its trademark, the diagonal and then the amount of the tile, such as the diagonal line, then the tiles is positive; then look at the flatness of the tiles, the most simple and effective method is to tile the same brand of two overlapping positive and negative, such as overlap significantly after the gap between two pieces of tile or you can rotate the tiles uneven; last look There is no color tiles, the method is to take out a few samples of the same type of tile, in the light are compared, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not exceed 20 percent sign), if the needs of the entire film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (already counted in the loss within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of error tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan required after the


135, anti-termite
(a) kick down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b ) After the entry of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is preferred (you can clearly see the wet)


136, the calculator is also a research dollars, and now the calculator has multiple functions to set the decimal point, making operations will have different standards when, so we need to bring a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.


137, two better prepare themselves neutral glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for sale, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them poor quality, easy to change color or mold the future.


138, if not a last resort, do not use toilet seat shifter. This stuff is very likely to cause clogging toilet bowl water.


139, Lvkou Ban kitchen, two above the hood, open the holes we have to wait a good hood completely up security after installed. An early and I go home, and later removed to install hood Shiyou, apart and put them all out of shape by workers, seamless ceiling has become a ceiling joints.


140, if the purpose of uniform appearance, is also fitted kitchen and bathroom doors, and that soon after the installation on the door marked with the ground glass joints where glue. I do not have time for processing,timberland slip on shoes, water workers are not careful, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.


125, the most hassle free way is to use online resources, the collection, retention, sorting integration, will certainly be useful when.

126, in order to save time, improve efficiency, each has a gain on the decoration materials market, a detailed and practical procurement schedule and budget is very important.
list by room category procurement plan is easier to implement: each took to the streets to see things the same room, to facilitate comparison and comprehensive
together, likely to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six children
housing projects, study projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: data in the table as an example. This list is used as a procurement plan
more convenient, pre-construction projects may be appropriate to re-classification by type of work merge into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (emulsion paint three batches of three brush; shoe plate by Albert, brush polyurethane varnish) and so on.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.

108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to seasoned painters speak.)

111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.


101, during the construction projects are sure to increase or decrease the price they asked for and then write it in black and white.

102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton wrap, a good window and floor tiling also appropriate protection.

113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a symbol of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installation time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.

120, decoration team choice: As the first company selected the guerrillas or the regular, I think is not important, the key is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most part is this, if your time is very rich, it is another matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various factors and decide what the next items you want to outsource , which items to decorate the company to do.
the decoration of the people, the decoration of the offer as low as possible, of course, contrary to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the weight of relatively low, this way, the project quality and the quality of materials is more difficult to guarantee. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at numbers, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an art to.


121, the construction? As I am not eager to stay, it plans to look for casual workers: your neighbors a good home builders are likely to become the object of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by step step by step, I believe, working slowly and deliberately.

104, do not do the best furniture fixed, because it no longer may be some changes in the layout. If we do have to grasp the quality, or endless trouble.
Tomy852929 is offline   Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 12:07 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum