Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Safelist Directory

Safelist Directory Safelists will also work if you use them. The bigger the list the better isn't always true... sometimes the smaller lists can be just as responsive if not more. It all depends on you and your dillegence.

Reply
 
Thread Tools Search this Thread Display Modes
Old 07-17-2011, 07:12 PM   #1
H3066vhxe
 
Posts: n/a
Default 200 {elaboration} tips ( {marital}, no{marital}ed

1, the partition will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas furnace top mounted light. Given the location of the bathroom floor drain must first think well, a good amount of size. Drain the best side in the brick, the brick in the middle location if so, how to slope either brick, floor drain is not the lowest point.
2,Supra Skytop II Shoes, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a pair of level switch with a plug appropriate. To get busy cordless, pull the plug precarious
3, sun angle on tile part of the treatment, in the final analysis is to look at worker level. If the level of good workers, plasterers, tile tools and wear better, they should not hesitate to choose the practice of grinding 45-degree angle. In effect, at all times a good grinding, grinding 45-degree approach angle of the sun angle is the most beautiful! If the level is indeed not very good worker, then you still choose to use positive angle of it, because the mill's bad practice not as good as 45-degree angle with the angle of the sun's effects.
4, line up the pipes after the water pressure test is also very important. Test, we must all be present, and the test for at fewest 30 minutes, conditions permitting, the best one hour. 10 kg pressure, without whichever cutback before the final test.
5, when the steel doors steel doors must be considered a good size frame protruding wall to accuse the installer, making the last frame and had finished the wall tiles are flat, so not only beautiful, and good health to do.
6, carpenter and mason's Door package is to tie the tiling, including door pocket of time to consider the following ground (the ground side of the door both side) is also tiled cement mortar or other thing, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door stained, moldy water will cause wood Door
7, mattress underneath and must be breathable bed. Bed board is generally best to use cedar board
8, do the paint as much as periodical tape
9, buy a lamp to note: generally try to use glass, stainless steel, bronze or wood (shelf), and generally do not buy anything on iron What other plated coatings, ah, ah what variety of paint, lightly fade.
10, as with ceramic basin basin, glass basin downright Health
11, water reform plan to be their own good, ask them to open the straight-line Cao. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.
12, water must be good, be sure to test the water!
13, a lot of construction in the verbal accession into the gap checkout massacred, must be written in black and white, amplify or decrease in prices of items are sure to ask, jot it!
14, on the ground if mounted floor, the ground must re-do the cement layer to re-smooth.
15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.
16, the living room as much as possible to install the power plug.
17, is still to be done outside the shower toilet sections. Not trouble the easy way to pull a shower curtain, the actual inconvenience, water everywhere.
18, do door and door frame of the wood material to choose carefully the material.
19, before installing the cabinet must be sure your home's water is OK.
20, kitchen floor tiles will not elect pearly.

21, paying particular attention to the ceiling flat putty before wiping Dulux
22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!
23, to buy the things you need to install those jobbers will be required to install, it does not include installation, after installation, it must adhere completely to pay money! !
24, decoration, your formerly collected business cards contractors carry
25, Lvkou Ban protective movie is best cleared before installation.
26, the shoe is best to use shutter, anti-odor. You can depart a shoe channel side, to plug bake shoes.
27, where the cooking can be a small security lights.
28, it is convenient restaurant exhaust flare can also be safe, so when you eat hot pot or do not dirty roast house hall ceiling.
29, the door is best placed to plan a debris of the cabinet, can be placed above the shoe. The general things, such as umbrellas, bags, scissors, coins, and so eat of the drugs in there, so it is convenient.
30, there is no need to use your ceiling, as not too anxious about humidity and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, a passenger guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too priceless.
2, using the net color, primarily the kitchen ceiling, white on the good, and white unless color and decoration style of match, it will easily inconsistent.
3, his gripping mind, do not deem selling the vision of smallpox, their eyes Barbara taint.
4, staring at himself in the scene, while income is important, do not let them lax, or leave the black seam, how to look how ugly.
31, third day of the main hole and continue to paste tiles, scope hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be chose before the hood, stoves and water heaters, etc., to determine the hole size.
32, although taking into account the custom-made cabinets look good, but not durable, comprehensive online views and experiences of some students, the use of cement to do to counter the structure of internal and external sides of paste porcelain, marble countertops, wall cabinets and counters wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And the cost is small. Many neighbors said looked good, I did not thump.
33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively smooth wall, accepted 2-3 road on it. Pihui granted when a gray polished once, and then paint brush after brushing but also slick, and eventually double with ICI paint brush, the whole wall look smooth and flat, really good. Upon completion of the ceiling wall, carpenter started wardrobe. The wardrobe is 18cm Albert card Daixinban do outside paste veneer, although there is no furniture store to buy so agreeable, but durable, quality should be better than buying. I am not terrified of standing vessel board. Buy probably will not work. Backplane is relatively thick, thin to buy that.
34, while other students in the tiling must note the following:
① best he can in the field.
② some of the less faultless tile can be attached to the future of some workers to see the location, such as cabinets, sinks, mirrors after, but also pay attention to tile, brick, etc. Do not waist was attached to the above position of workers, or What you can not see the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the flood damage must be enough time.
④ Be sure to drain plug with someone nice out of concrete down to discourage clogging. My home out for the cement floor drain is blocked, it took 30 management office to detect clear, get up a lot of small mud.
⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go,Supra Vaider Shoes, wasted a lot of brick, very sad, all perspiration Mimi Yeah.
35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out its long, high. And then deduct a window and door area. Finally, count the ground area. After you put a good amount of size, you can also get to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.
36, the best is a two bedroom dome light control, and a door, a bed, a bed of winter save up and then turn off the lights.
37, the socket must be considered a good location, height, interval. Even first play location having steel cassette, put away after a cassette is found just by television cabinets, microwave, desk stop, the first two had to move the location of furniture, high, and finally found not only ergonomic height, but can not be bought a good eligible stainless steel cabinet legs, only customized aluminum feet.
38, fair nigh the corner in the hallway like the one installed, that there are shine efficacy.
39, when mounted lights did not consider the placement of the table, the table now is not in the middle of light.
40, bathroom tiles do not use too much dye, one easily dirty, and secondly, a long time too dull!

41, outlet to more equipment, furniture to buy outside the ground to be considered safe to filth, kind of room to look, in principle, to cling to.
42, Lvkou Ban did not need to buy high-priced, very low Lvkou Ban the effect has been distant better than PVC, the more money I can not see significantly different results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.
43, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.
44, playing in the balcony on the altitude cabinet on the back of the cabinet, then a layer of foam board insulation with water works well. Balcony door is best to use the same type of fire board. Balcony environment is bad.
45, if no suitable molding may hope to order, custom-made quality also seems better than the sample. More personalized and customized.
46, bathroom floor cabinets with stainless steel legs are mammoth profits, the back of the store to find some place to buy cheap price crazy.
47, setup the door lock head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall harm.
48, Paco floor well, I like only to remind the owner to talk directly to the price and the salesperson to talk about than the price better.
49, matte paint is high and the light beautiful
50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the junction box with the old, electrician recommended on the interior ones, and He now found this valuable suggestions.
52, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.
53, Under Counter Basin Above Counter Basin than slight, nice, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.
54, without any revision of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter clearly put along. Ding Jiaoxian angle helps to play a straight line.
55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball handling is very appropriate.
56, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.
57, frosted glass, not stained with the back of ten million to protect the paint, is difficult to clean!
58, Caipen guiding back of the hand switch must be secondhand, that must be not easy to keep neat fingers, the hands are turned up when the fuel is also laborious.
59, the price of elegance automatic racks too much water, and found some of the more renowned brand is not on the structural design but better than the brands, prices are much lower.
60, could be considered safe on the ground of the metal socket, the socket 100 is very expensive, but very convenient, usually flush with the ground, feet a foot on the socket can pop up. Suitable for large living room. Or security in the dining room table below, to insert boiler (to prevent hanging back and forth when moving wires)

61, storage room. TX has been said, merely I did not do gates, looks quite beautiful, and easy to put nasty clothing sideboard.
62, starting bed skeleton (the so cried it). I am a vocational company to buy the cloth bed, bed, and spent 350 yuan and a such a thing, end of the bed there is a pull handle, bed board will turn up, exposing the base of the storage space, Terrific Oh!
63, is not practical double-pole towel rack! Current and single-pole uses the same elementary look forside layer will not be hanging pole and then drying towel
64, that is not practical cabinet inside the trash can, as on the outside. There do not install the door and the table plate of the litter bin, open the door when the summer will be very smelly. Trash or on the outside good.
65, the table afterward to the small closet, and can be placed on some stuff, very convenient.
66, on I think the mop bucket less demanding in terms of performance, can assemble one yourself out, covered with tiles and match the surrounding environment or the mosaic that is beautiful, and save money.
67, the bathroom can fasten nail point of hook to hang something.
68, designed a bathroom cupboard to put clothes, no longer must fret about bathing forgot to clean clothes.
69, suffered a caustic practical washing machine with dryer, in addition to a year, only the yellow mold-day, and the evil mammoth. Thick clothes, towels or drying discontinue, let the sun more than a good consumer disinfection. Even been overdrawn, you need to save the point of silver.
70, even in the laundromat room to do a laundry pool, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.
71, fitted with lights is not really practical, not the decoration finished now opened. There are just SHOW visitors to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under romantic, now do not have much accident of opening spotlights.
72, most fitting experience is really as uncomplicated as possible, less pollution, less money, truce of mind.
73, useful stuff:
①-designed warehouse apartment.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing trays and vegetables.
③ bathroom to wash your cilia you can pull out the governor. (Wash basin was never the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table lamps.
74, to buy their own toilet must be a good amount of pitch, or go buy a return that is really ... ...
75, posted WeiChu tiles after a good amount of what did not dry before the best level to see the lowest point is not the location to drain, or other dry and then passing the buck and decoration team, a lot of die cells.
76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling, Mason posted. Pattern did not look good also
radiation.
77, bathroom shower room must be large ample size, and use transparent glass, so there does not seem cramped shower.
78, should not use white cement tiles pointing nail. No month into a dark sew, hideous death. The results they have bought their own hook pointing surrogate, that exhausted
79, artificial stone cabinet after the next board should pad the results found no installation, and now can not cut the beef in the above, have agreed to give me equipment almost two months have not installed (only to polish a).
80, do not believe the spell of the designer. Of course, you can visit more than several decoration companies, from each chart to extract the real profitable things, the opener is you want to masquerade to look like family promotion.

81, if the floor drain installed the original developers have the kind of injure smell of the
82, attached bathroom floor tiles after a good test the water, if water is relatively slow now rework. Our household's water is relatively slow, then relented a bit, now it is always a mini bath water, and made hundreds of our main Guardian silver shower pate is sleepy, it forever surprising how to cure.
83, fitted wash basin and mirror to be considered good, put brush cup rack, towel rack relating position.
84, to consider when buying a mirror the mirror front lamps, if you do not want to install a short-lived mirror front lamps, mirrors the size of the mirror to be able to cover for the best line of headlights reserved.
85, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing powder within the debris. Both beautiful and practical
86, must be looking at act upstairs upstairs leaking water .... otherwise, get a hanging cabinet, the wall is a muff ....
87, do not blindly follow buy online, I later discovered that some of their own to buy cheaper than the sale.
88, TV wall must set a few more outlets, TV, DVD .... a put, you will find enough outlets.
89, change the water well in the future to be considered before the installation of a large sample of wash basin, case in point, the left or right pots pots, water and drainage that is located where. Otherwise, changing for the better after the breakthrough period of the wash basin is fit!
90, on the curtains, we had better put your linger a size goes, the employer shows no less size. If less, then how come the. Or watched him cut his napkin.
91, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task).
(3) cutting trough, water reform and acceptance.
(4) seal groove hidden underground water upkeep project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall attached disk.
(6) Woodworking approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) concurrent production of wooden doors, door style and platen.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) skylight leveling arranging cruel countertops.
(11) neat panel, pasted, fine line making and installation.
(12) wall of primary treatment, grinding, leveling.
(13) utensils, door seams paste adhesive (protected side).
(14) ICI at least three times the oil the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, the baseboard.
(17) lighting, sanitary ware, handle, door bolt installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration prefatory acceptance within the company.
(20) 3 prim approval of meeting, distribution owners.
92, the valve back together before the flue must be clean to ensure the valve can switch freely and competent to open to the highest, otherwise it will affect the effect of cloud hood. Ceiling can be installed to remain 2 not installed, so the hood and try and correct installation of the dome and then installed.
93, so much in the living room and dining room ceiling can not do not do.
94, take the line in array to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a width of rope, leaving a trace of regret.
95, the house in person to weigh and log the assorted sizes accessible, can be Broche size blueprint size and then re-covered cable marked the final size will instantly affect the decoration and furniture purchases.
96, the small size of line is not good if the plebiscite is not always black walnut air, then the need for trade-offs, or to accommodate actual or devoted their own motifs, of course, the best do both
97, began looking for decorators. In terms of private experience, if I were you especially large family and propose to simple decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have peruse and engage to the eyes, especially the consciousness of the person in charge of the decoration is even more important, responsibility and appreciation of how, some of the former is more fussy, because if not a stripped-down, in fact, those who live almost cheating the will to do, but the quality is good or bad may rely on a sense of responsibility.
98, the main furniture such as sofas, closets, dining tables, chairs, cabinets, etc. in advance to see more of the best also, if the running around on tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you have to do is slowly according to their lusted style percolate out the right things. Some people take a good style, some people have exact grasp of color, it does not matter, anyhow, there is time to consider, if you wait until cleared decoration, furniture, help wanted to see the steps and then reluctantly adopted the inevitable end will not really like it.
99, yet optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.
100, buy something necessary documents be sure to keep the move on the latter may exist back, a replacement is indeed useful. In particular, some important items of the store receipts, brochures, etc., because a lot of things have a engagement time, testify lost would be more trouble.

101, the process of construction projects are sure to increase or decrease the price they asked for and then write it in black and white.
102, check for the necessary construction of protective measures, such as entry doors to use jewelry cotton wrap, window and floor tiling good must be properly protected.
103, as much as possible to communicate with construction operators,Women's Supra Skytop II, to resolve whether he understands your intentions. Put themselves in adore of each teacher's work, respect, the importance of people feel at home, then began to live it more responsible to do so? There is an age saying not to ask (But if you are faced with treacherous cunning tease who, it would must revenge, discuss) of special note to some of the brim of the project is the need for several types of co-ordination, responsible operators with each other and coordinate their relative duties, Otherwise, we pass the buck back and forth, all pass the money. I like Mason to aid me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, by the time he is willing to help you find a way.
104, do not do the best furniture fixed, because it no longer may be some changes in the layout. If we do we must grasp the quality, or endless troubles.
105, be sure to change the water carefully, one costs money; second, if not the ceiling from the floor must be laid down in water, if water problems big trouble.
106, according to their actual needs and reasonable arrangements for wiring, so as not to waste (especially the cloth with a lot of lights and lighting if not practical, we must also try to avoid the array to use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, and often with a hairdryer and razor; well inside or below if the shoe has a socket is also good, shoe appliance can bake, I am now very apologetic that no cloth lines.
107, the bathroom as wet and dry area, if the area is small with a base like (special glass basin was dirty, lazy remind); conditionally set a waterproof cabinet incorporating a small debris is best, put everything certainly does not look good on the outside.
108, wood glossy white paint brush than when the nitro-polyester good (this is to listen to experienced painters speak).
109, the cabinet must be selected carefully, to look at several of the quality, we go to do a solid strong as this one are easily thousands of ocean, but also related to the stove and sink, etc., they still do not blindly ravenous cheap good. But best not to do in the cabinet table or inside the trash can; if there is restricted funding, basket, basket seasoning, rice bucket of what you can do all of these accessories in the cabinets sell the company in general is very expensive.
110, wardrobe prefer than not less, rather large not small, women remember! Hanging space to be able to put up the clothes.
111, bad handling glass or mirrors in the neighborhood of the best things to buy, or Be ready to transport usages.
112, shutters all the best in furniture, utensils and then customized reach to match the overall style intonation. However, before cleaning the track can be installed.
113, change the gas pipe is best done before tiling, or may damage the wall. Best to let the gas company to draw a figure or on the wall as an arrow, because the cabinet company to be required in the cabinet body openings.
114, cabinet installatiin due time is longer, ranging from 4 to 5 hours, as many as 2 days, must be psychologically ready. Installation can be used to check whether the material is that you set (you can see through the hinge hole cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those dead ends and then cleaned.
115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes selected, I was not looking at the results too small a distance between the layers, hanging clothes stretch not open, even after adjustment.
116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture in all the open doors the emission of odor, but also buy a special spray to eliminate the smell of things to come.
117, installation of combustible gas, reservation gas ignition.
118, brush wood of the time: the best Puwan other room painted tile or wood floors. If you must brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust easily attached to the wood surface, wood products, have spiked sense does it feel, which nevertheless can be higher label of sandpaper and then brush it again to solve, but in the end it feels to feel the brush and the overall effect will be discounted RBI hit. Room Puwan tiles and then brush, then the air of dust content much less than the mart front, with virtually no brush again after the dust attached to the wood surface of wood products. This is so because when they run into a small decoration Wu case, I had determined to buy in Canada Wood had seen it like a brush effect, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to play a lot of discounts, it has been a material of regret Xiao Wu. And plus I like the union buy the paint process, the students also seemed in this home. So here remind students to pay attention to it. I do not know whether other wood case, but according to the principle of same reason, so here remind students to pay attention to it.
119, on up painting: painting preceptor pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the paint if no reason is required to install lighting and a diversity of electrical switches. Ask somebody to install lighting and electrical switches to caution the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a dirty wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to make sure the paint division team to pay up painting anew, that is to get clean and dirty walls (if the paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint). Just note, do not let install lighting division to pay tarnished walls, you can pay less to make a junket to the paint division (at least half a daytime), but also facilitate a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to dodge the Wood in the process of dry brush will paint the walls of the wall clash. Of course, in tangible operation, you can also Puwan after tile (floor tile wall putty prior permission has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will affect the period. If the alarm of affecting the period of the circumstance, but also in the wind to minimize the effects of dust, then a lot of points to be hard-working about cleaning the room of the health of the.
120, the decoration team selection: The first choice guerrillas or formal company, I think is not important, the key is to give you the head of the construction team is solemn and responsible, the decoration of the capabilities of workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most part, so, if your time is very rich, it is another matter. And decoration companies to talk about this before, must be clear that you must do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the following ingredients to decide which items you want to outsource Which item of decoration companies do.
the decoration of the folk, the decoration of the attempt for low for feasible, of lesson, inverse to the outlooks of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively low, this way, the quality of the projects and the quality of materials is more difficult to assure. Fitting so numerous, you want to unattached item is the lowest, it is unrealistic. And decoration of the offer, not only the number but also depends on the contents inside, the matters used in this project, specifications, brands and so on. You know, the decoration of each offer, in truth, are of excellent stress.

121, the construction? Since I am in no hurry to push in, so plan to find occasional workers: the neighbors a good home please artisan, may be I look in the object: a mason, a woodworker, a plumber, a painter. Design tread by step step by step, I believe it slowly and deliberately.
122, to use every cent wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economy can withstand . May be a short period of time necessary to purchase these things in place, the economy pressure is really big. Most people at this time is often in disarray, the result too much over budget the last one, the second is to buy good quality stuff at the United States, then buy something is uneven.
My view is:
one pre-determined price, after the election materials.
excess of the anticipated price of 10 percent-of material goods,Supra Shoes UK, do not waste time. Business consumers always fine too. I am doing a detailed timetable of materials needed in the future blog post will be posted for your reference.
Second, province to province, the spent flowers.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problem areas are transformed, kitchen water.
123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter common furniture.
124, covert project was not the most important place to save money: water circuit transformation, water treatment.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter of $ 40 per meter circuit is $ 20 for half a annual warranty. B & Q on the first floor in the east of the detailed individual services and offer bulletin, we do reference
125,, the easiest way is to use online resources to gather, retain, finishing the integration, the future will be useful when .

126, in order to save time, improve efficiency, decoration materials on the market each have a farm, a detailed and practical procurement schedule and allowance is important.
Program list by room species purchase is easier to implement: each took to the streets to see things the same room, to assist approximation and comprehensive
together, threaten to have success.
one hall project
Second, the living room project
Third, the cafeteria project
four master bedroom project
five children
6 housing projects, study projects
seven cardinal Health Project
8, nine passenger Health Project
kitchen project
ten, balcony engineering
XI Yin Taiwan project
are listed in the plan to put my own post like the following table, for reference: data in the table as an example.
This list is more convenient for procurement planning, pre-construction projects may be suitable, by job re-classification of the merger, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the table can also be added in the If (three batches of three wall paint brush; shoe with Albert plate, brush polyurethane varnish), etc.
127, home theater rear spokesmen, the sound to be embedded wires in the living room below, this is very important!
128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very major, gardening, bathing hands.
129, toilet, kitchen need backdrop melody, sound audio wires embedded before the renovation.
130, both sides must be left socket on the balcony, hanging lanterns, when the New Year, good power.


1: the bathroom is divided into wet and dry region 2 wet areas of the floor drain on the better
2: If you scald normal gas water heater attention to the bathroom to have adequate airing settings
3 - 4: If you do not know, then you can ask a professional friend to companion the main immediately lie more.
11: hydropower, or find professionals to help themselves because the features in this respect he is to inform those who design their own needs to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the demolition of the wall is a very big head thing.
12: toilet water to depend on their alternative to tile bathroom floor tile is a professional waterproofing has to do this at time of purchase, but you can recess assured water to do well because of design problems in the alternative of size If you meet after the designers got the idea he would not cut off the bricks to fill the ground so that you devastated the original design of good waterproofing, floor tiles, floor tiles are of course so early you can find out, but not your home is to live for decades we need a long-term guarantee so you must pay attention to the design of the bricks in the pavement without being destroyed
19 when the combination is now bought ready-made cabinets are the most direct is because the family The water issues need to be near to build the design, of course designers in addition to water designed to inform the designer must determine their own homes who are often under the kitchen cabinet so to better determine the scale so that when you cook at home more comfortable with the cabinet panel recommended to choose such a large load to bear safe



white cement tile grouts and method is not the same, but the masons are usually fraught with white cement tile grout filling method, so epoch, gone sealant, sealant, and a little bit better to be pointing to the wall instead of doing the paste. Also, the cabinet hinge, pool water, so use a good switch, meantime the cabinet fabrics, pool cell body, bolt can be used in general,Supra Footwear, of course, if you will not attention about the money.
If not a big package, I suggest to buy building materials as much as possible to homes in the East, was home, B & Q and other places to buy can be returned. 131, at the entrance of the light switch, it is recommended to use sensor-based. Black day to go home, save the dark.


132, shows a basic construction, water, electricity transformation
(a) the construction team on the water before entering the construction of a minute test, before they are allowed to change tubes.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circumference to be buried in the dark wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, Wei
(b) 30 cm from the wall to do it twice, more than 30 cm can do it again, wrap need water at the door pocket door.
(c) waterproof achieve to be dry, a Redo waterproof layer. Where leakage is most probable to


134, tile
(a) in the culling of tile owners of tile necessary for quality finds its way: first look at its color is uniform, non-variegated black spots and holes the line; emulated depends on whether the standard of its size, the amount of tiles with the tape measure the length and breadth, measure the size of the trademarks to its factory the same size, then the amount of its crooked tile, such as diagonal line, the tile is assured; then depends on the flatness of the tile, the most simple and telling method is to tile the same brand of two overlapping affirmative and negate, such as two stacked premonitory gap between the tiles or you can turn the tiles irregular; last look There is no color tiles, and is out a few specimens of the same type of tile, likened in the light, such as do not see color differences can be ordered.
(b) After the paste can not have a whole piece of brick tile hollowing (prejudiced hollowing the entire piece of brick can not exceed 20 percent), if the whole piece of brick hollowing be rectified, under regular circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (already counted in the loss of) from them, such as Over this range, the main material from the construction side is responsible.
(c) Normally, the level of tile degree of peccadillo of 2 mm is allowed, the gap be the same tiles, bricks and tiles ought be smooth on the turn (allowed error of 0.5 mm), pantry, walls tiles in addition to health bricks and tiles should be flat on the turn, the need to level degrees (permit 1 mm tolerance) and perpendicular (allowing 2 mm error) to fulfill, bathroom, balcony to the ground drain tile ought be considered, you must 1st put away the tilt, whether there is no special reasons, there is water.
(d) in the wall and floor tile Puwan necessitated after the


135, anti-termite
(a) and finish the wall behind garbage collection trough, a comprehensive anti-termite (ie, whole-house spraying of termite narcotics)
(b ) After entering entire the plates in absence of anti-termite management (specifically as anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite treatment
(d) termites spray to wet the drug is better (you can apparently look the wet)


136, the computer is also a design study, and now the calculator has multiple functions to set the decimal point, making computing time will have different standards, so we need to send a calculator yourself, there are now calculated on a cell phone functions, but function is not necessarily good.


137, to prepare their own two good independent glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for bargain, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general factory installation package will come with glass, plastic, glass plastic, but most of them meager quality, the future is easy to change color or moldy.


138, if I were you a last resort, do not use toilet seat shifter. This stuff is very likely to occasion clogging toilet bowl water.


139, kitchen Lvkou Ban, hood top two, a good hole must be completely installed so hood up after security. An up my family's early and later time and remove the hood to install, disassemble dismantling equipment, workers are busy in out of fashion, has chance a seamless ceiling ceiling of the seam.


140, if in order to unify beauty, kitchen and bathroom doors are installed, and that soon after installed in the door marked with ground glass joints where glue. I do not have time for the processing, water workers are not careful, a lot of water splashed on the floor bleeding to the door frame, the following part of it has little black (mold) of the.

141, must be tiled balcony! King balcony to angle around to shop, shop to live with the railing to the balcony with the high. My family view balcony to balcony wall angle and the life is not paved, but to prepare a bucket of appearance wall, they periodically refresh ... ...


142, sealed in the wall before the water reform must allow the main to cater careful decoration water chart.


143, as if ready to brush the wall color, the transformation in the power line when necessary to take into list for the problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to retention money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future upkeep. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest level I made an error, I presume that the 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside lamps to stay well back of the wall socket. As a result, there is no socket to be blocking the way to use.


145, started before the skipper to make analysis of the wall decoration how to handle with the need to spade out all the original abrasive. In particular, ready to paint the wall engineering companies outsourcing to students. My family is narrow-minded out to paint companies, such as carpentry finished painting the walls look gray to know the original is wrong, it is best to spade out the whole re-Pihui. However, woodworking has been done, to shovel the ash out of the original bad operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line will certainly be re-wiring. But from the nearest extremity branch wiring. The increase is not allowed in the original wire connector on the wiring.


147, air-conditioning control switch only in the power supply side. Added line on the road is not allowed.


148, alteration the situation of phone and web lines, they can out of the original fabric of the line to proceed to use. However, if the improper construction there will be many secluded perils. So it is best to box from the room for feeble lines.


149, the transformation of the workload dimension circuit, generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (measured by the length of trunking, if a tank more basis waterway, according to the number one half pipe the other half contained in the overhead line).
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cord, along to how much even now the number of replaced (replaced the line to acquaint the construction team do not throw).
(4) weak transformation, according to the first method. The feud is who is to pay attention to weak-line purchase. Owners will have to buy less wire prices.


150, fixed the toilet to the floor, kick the screw with it? There is convergence at the pedestal and the pipe, to buy what were sealed and the outside is better: the toilet is firm with the expansion screw. The interface between the pedestal and the pipe at the inside with a special sealant toilet. + Out of white plastic with white cement slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy the materials themselves must first calculate the resemble amount. To buy water when the material to do the latter anyway, preoccupied about painting with the sea chart in the end how much material came out, so what little confidence the foreman, the result was found to buy water 5 meters, the actual use 27 copper head one, actually bought a 40, should the remaining 13, seven short of the actual remaining six. Under repeated answering from other sites back up foreman Detailed calculations of the pre-circuit their own material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 m to 13 m, other issues such as insulating tape, plug both large access was I correct ... ...


152, if the old water pipes under the ground, in addition to the drop when the switch is often damaged, do not hesitate to be laying a new, do not save, to ensure safety .


153, the kind of retraction on the bathroom walls, the mitt do not waste space, and posted a very good very fine tile. Of course, tile alignment that trouble to say


154, sun angle tile lines do not use the earnings side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not select Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed muscular, and loose some of the good thing.


156, hall bathroom on the ground if the percentage is high, the conversion can be used to solve the door stone.


157, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results .


159, buy Lvkou Ban particular attention to the keel and not Lvkou itself (Lvkou goal namely no effortless to meddle too much), normally on the keel complete specter.


160, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.



161, below the supervision of the ground water offensive to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not perturb but guaranteed.


162, the slope of the bathroom floor before tiling to consider the good, the slope is not in agreement with national criterion to achieve the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people mention that soak slope and pretty, I meditation it is rubbish. On the contrary larger slope water to speedily escape a clean is a very reanimating thing.


163, platinum-point doors launch with the LG panel, the effect is good, but if we might consider fitting tailor-made ended door. Hand-made door is not nice, for reference only.


164, sink a large market brand-name price is not cheap, brand-name quality lunatic bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is bad.


166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the future good fit.


167, the glass is ponderous stuff, the best buy in the vicinity, or Be ready to transport methods.


168, install the lock bolt head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.


169, matte paint is pretty high and light,Supra Skytop III Shoes, do not listen to the painter, and if a bad brush matte painter said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not cheat your


170, with insulating tape and raw materials do not buy in the store, large supermarket quality was much better, and full weight, transition down the price is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Fired the painter, especially after his own experience when diy - talc tone putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the inner, the original will want to save wages outside the old junction box use, recommendations on the interior to get a current electrician, he now found it very invaluable proposals. On the interior door is not ugly, it really easy to use!


173, large interior design company directly to workers on site clearance work package may be more appropriate, and better technology, tools, more


174, and air leakage protection switch to use the brand appoint. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the jaws longer.


177, the aperture before installing the restroom is a big, colossal floor drain cover can fall off, if your floor drain has been installed and the restroom is not installed, do pay attention to the floor drain cover, or the floor drain cover it up somewhere custody 也好.


178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if the kind of place in a very important element 7,8 can also be used, case in point, aluminum window frames with inner Anjiu levels of silica consume to plug the whole. But use the bathroom all the GE silicone kitchen, amount for money!


179, triangle valve should not be disregarded, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not leaking, if not installed, only the last copper fittings installed on the faucet to take over the baby when it was installed to check whether the internal leakage, the absolute leakage deserving to pressure some time to test out the final installation of internal and leading it more secure.


180, even the journal has been renovated to do about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the comprehension of your ideas, to depend on them.




181, fitting the biggest problem is communication!


182, is not the place, type of kitchen cabinet door designed, BH. Should be designed L-shaped.


183, general decoration, decoration companies, excluding the formal management fares, tariffs, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, in the kitchen to go outside the ground water, since home improvement is to give a time mine, who state clearly whether Shashi Hou for his trouble.


185, if the separate tube wear, but in a tank, the impact it? Effects can persevere


186, inquire what among the dining and alive room separated at the most cost-effective package door pockets, side bag only 6 cm or contaminated with white, height 2 m is not significantly large High raw.


187, respectively, to strong and weak electrical displacement pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can penetrate the tube.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to non-pungent savour. In fact, you are using a good wood kernel board, do not deal with furniture inside.


189, PCT board and the cabinet can be wood core board 15, the back of the 5 available folders, Wuli. Package doors and Tizi use nine per cent. Different processes with different materials.


190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are entirely integrated into the tube together, so once installed oppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leaks, lofty water of green materials.


191, paint embark is good, the conveniences of either wood and composite.


192, do not print for a long period on the rainy pretended stone, unless you ambition to dry a typography chart; not take long wet tearing board on the table. Wood wet sometimes fade; rub the dye with a steel pellet, like hand squeeze pimples.


193, can use an ordinary gas meter cupboard door sealed in it? Need to use the shutter-type door it? Regularly retard the ventilation beginning on the line.


194, clear contracting the tx Please note that you must validate the renovation team to open a list of materials. There may be certain about their estimates, I too believe that they, and the results to buy wire and cable management about doubled.


195, the size of certain blueprinted sanitary ware, the best sketch in advance, enumerate the size.


196, buy the product the students pay attention to the door, if you want to pursue results matching panel with a business package Door, then you may must be Henzai sword it!


197, Re: installation of water pipes before they take the leading and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leadership, leading 99 percent sign and fell into the water are in line with multinational norms, by the time personnel are not slovenly, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the quantity of elements in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and cold water pipes with cement tiles must be sealed before the 15 cm accuracy, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.


198, if an 8-core cable at the same time take the phone and network, will not interfere with each other it? Not. 1,2,3,6 hit the cable module, 4, 5 playing on the phone module, and the other two easily. Right in saying that my experience: 10M 1236 100M to be used with the fact that the speed to 10/100M that we will not feel any difference if using a 8pin line, then some program-controlled switches marker will cause the network signal interference in the home environment generally will not have any problem. But rest assured that I can recommend such a divide route to the future, leave margin, cable is very cheap you say?


199, check the delivery box must be properly installed.


200, fitted bath and shower faucet lesson taps joined to the tube is embedded in the wall, I have repeatedly told them to get accurate measurements, do not install when the time is not on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not parallel, the results of the water feeding the electrical charge of the coerce was the placement. Yesterday I found that fb GROHE thermostatic mixer coating even be forced cracked. We can be installed if the leader, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early lead, is Oujia master to buy.
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 09:20 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum